The Spring Ridge Road Phase II project is located in Lassen County. The project is 1.2 miles of roadway from Hwy 139 to Wada Street that was a complete reconstruct with soil stabilization.
Black Eagle Consulting, Inc. also completed Spring Ridge Road Phase I project which was located north of Hwy 139 and continues west to the north end of Numa Road. Phase I consisted of 0.80 miles of roadway that required a new two-inch overlay. Black Eagle Consulting, Inc. provided a full-time inspector on-site for the Susanville Spring Ridge Road Phase II project. BEC performed materials sampling and testing, roadway construction inspection, and subgrade stabilization.