Argenta Hall Reconstruction Project

The Argenta Hall Building had to be repaired after an explosion that occurred on July 5, 2019. The construction costs for the building, which can house 770 student residents, was estimated to be near $40 million. Black Eagle Consulting, Inc. is providing materials testing and special inspection services for the Argenta Hall Reconstruction project.

New Deantronics

The New Deantronics Building is located in the Spanish Springs Business Center. The 200,000 sq. ft. facility will be used for medical device technology manufacturers for research/development and manufacturing. The facility is also going to include a medical device incubation center for local medical device start-ups. BEC’s scope of work for the New Deantronics project…

Integra Peaks

The Integra Peaks project includes 5 4-story apartment buildings, 1 1-story clubhouse/leasing building, 5 2-story small outbuildings, 7 single-story detached garage structures each with 6 parking spaces, asphalt concrete drive paths, a swimming pool near the clubhouse, and landscape improvements. A total of 295 1- to 3-bedroom apartment units are planned. The project is in…

Summit Christian Church

The Summit Christian Church project is located in the Sparks area. The project involves the design and construction of a building addition and associated improvements north of the existing building. The new building will be an approximately 23,500-square-foot, single-story auditorium portion as well as minor areas for administration, a lobby, and a café. BEC completed…

UNR Temporary Dining Facility

The UNR Temporary Dining project is a 408-seat facility that is heated and cooled for comfort and includes serving spaces and restrooms, with modular kitchens for food preparations and walk-in refrigerators and freezers designed to aid in the production of some 20,000 meals per week. Black Eagle Consulting, Inc. provided materials and testing and special…