Pinecrest Academy
The Pinecrest Academy project is a charter school with three school buildings and associated parking, driveway, and playground improvements. The buildings are 1 to…
The Pinecrest Academy project is a charter school with three school buildings and associated parking, driveway, and playground improvements. The buildings are 1 to…
The purpose of the Nick Poulakidas Elementary School which was built in the South Meadows area is to relieve overcrowding at surrounding elementary schools…
The John Bohach Elementary School was built for 745 students to relieve overcrowding in the Spanish Springs area. Black Eagle Consulting, Inc. provided Geotechnical…
The Doral Academy project involved the design and construction of an approximately 65,097-square-foot, 3-story school building and an associated asphalt concrete drive path, parking…
Black Eagle Consulting, Inc. provided geotechnical consultation, materials testing, and inspection during construction of this 6-story, post-tensioned PCC parking garage. Our duties included evaluating…
The Renown Medical Center needed repairs to the existing parking structure located in Reno, Nevada. Black Eagle Consulting, Inc. provided special inspections for the…
The new parking garage will be four stories and hold over 300 parking stalls. This project is one of the ways the VA Sierra…
The 616,000 square-foot parking structure is a six-story structure with outside speed ramps and provided 1,600 parking stalls for the guests of the casino…
The project is proposed to be one of the largest, most amenity-filled private student housing projects in Reno by 2020. The 3.5-acre project required…
This NDOT project was the completion of a 12-mile extension of USA Parkway which linked Interstate 80 and US 50 to traffic. The project…