Pinecrest Academy

The Pinecrest Academy project is a charter school with three school buildings and associated parking, driveway, and playground improvements. The buildings are 1 to 2-story, wood-framed and/or Portland cement concrete (PCC) masonry block structures, and have PCC slab-on-grade floors. Black Eagle Consulting, Inc. completed inspections for the earthwork, site utilities, special inspections, building concrete, asphalt…

Nick Poulakidas Elementary School

The purpose of the Nick Poulakidas Elementary School which was built in the South Meadows area is to relieve overcrowding at surrounding elementary schools and provide capacity for this high-growth area. The elementary school is a new two-story building that was funded by tax money from WC-1. The building provides group learning spaces to give…

Doral Academy

The Doral Academy project involved the design and construction of an approximately 65,097-square-foot, 3-story school building and an associated asphalt concrete drive path, parking lot and play areas within an approximate 5.5-acre site located between Mt. Rose Highway and Butch Cassidy Drive in Washoe County, Nevada. Black Eagle Consulting, Inc. was retained by Ethos Three…

Sky Ranch Middle School

The new school is located on a 34.84-acre parcel; about 20 of those acres are being used for the middle school, and the remaining acreage will be available for a future elementary school. The building consists of 36 standard classrooms, three music rooms, three special education rooms, three flex labs or studios, two art rooms,…